Sammamish, WA · King County · Sammamish Plateau
Sammamish sits on a plateau above Lake Sammamish, split between two water districts. We find out which one serves your meter, then repair, install or winterize your sprinkler system.
Sprinklers are our core work. When a plateau yard also needs drainage, a patio, a fence or lighting, the Grizzly crew takes that on too.
Just your name and number. Danny will get back to you to arrange a visit.
Prefer to talk? Call (425) 648-9443
The City of Sammamish lists two water providers: Northeast Sammamish Sewer and Water District for the north plateau and Sammamish Plateau Water for the south. Their backflow paperwork is not the same. The city was incorporated in 1999 and passed 61,000 people when Klahanie joined in 2016. For frost timing we use Sea-Tac, the closest NOAA normals station, where the last spring frost comes around March 2 in a typical year and the first fall frost around November 23.

Our sprinkler services

Brown stripes in a lawn, a zone that sprays into the street, a pipe cracked beside a valve box. We locate the problem, repair it and run the nearby zones to confirm the fix.

New irrigation for plateau lawns and beds, with drip for shrubs and spray for turf, sized to the pressure your district delivers at the meter.

Lakeside slopes and flat plateau lots call for different layouts. We test pressure, walk the yard and set zones by sun, shade and grade before any pipe goes in.

We blow every line, valve and the backflow assembly dry with compressed air. Sea-Tac sees its first frost by November 6 in about one year in ten, so we book Sammamish blowouts through October.

Installs, repairs and replacements for the backflow assembly on your sprinkler line, including the double check valve the northeast district asks for on lawn systems.

Slopes that drain toward Lake Sammamish and low spots that hold water get a French drain, a catch basin or a regrade to move water away from the house.
Plateau ground
The city sits on a plateau with Lake Sammamish to the west and the Snoqualmie Valley to the east, and the land is hilliest along the lakeshore. Water covers 3.61 of the city's 24.04 square miles. Beaver Lake and Pine Lake are its two largest lakes.
The city maps an Erosion Hazard Near Sensitive Water Bodies overlay where slopes drain straight to Lake Sammamish. That rule goes back to an East Lake Sammamish basin plan from about 1994, and in ordinary erosion hazard areas the city limits work during the wet season. For irrigation, the lesson is to keep water on the lawn and off the slope. We run short cycles on lake-facing hills, aim heads away from banks, and send drain water to a proper outlet.

Across Sammamish
From the north plateau to Klahanie, here is what we look for in different parts of the city.
Sahalee Country Club opened in 1969 on a heavily forested part of the plateau east of the lake, its fairways lined with Douglas fir and red cedar. The north plateau's water district began that same year as the Sahalee Sewer District. Under big conifers, we route lines around roots and give shaded turf less water.
Inglewood's plat was filed with King County in 1889, making it one of the earliest communities in what is now Sammamish. Lots that have changed hands many times can hide old pipe, so we locate what's in the ground before trenching.
The Sunny Hills neighborhood was built in the 1960s, with an elementary school following. Irrigation on homes of that age may have been added or patched in pieces over the decades, so we check the valves and the backflow assembly first.
Pine Lake is one of the two largest lakes in Sammamish, with Pine Lake Park on its shore. Lakefront lots often slope toward the water, so we use drip near the shoreline and keep spray from drifting into the lake.
Beaver Lake is the other big lake, with Beaver Lake Park and Preserve along it. Yards near the preserve may mix shaded beds with sunny lawn, which is why we put the two on separate valves.
Klahanie opened in 1985 as an 884-acre planned community, finished its last homes in 1994 and joined Sammamish on January 1, 2016. Yellow Lake sits inside it as public green space. Systems put in when the homes were built may now need new heads or valves.
Backflow by district
Lawn sprinklers connect to the drinking water, so WAC 246-290-490 calls for a backflow assembly with regular testing. In Sammamish, the details depend on whether Northeast Sammamish Sewer and Water District or Sammamish Plateau Water serves your home.
Assemblies must be tested when installed, after any repair, if moved, and every year after that, always by a Department of Health certified tester. A copy of each report goes to the district, and you keep one too.
Lawn systems need an approved double check valve assembly. Tests are yearly, and results are due to the district by May 31.
The northeast district mails a list of certified testers in early spring, and testers can report on the district's own form. South-side questions go to Sammamish Plateau Water. Not sure which district you're in? The city's utilities page splits them north and south, and we confirm before starting.

Source: Sammamish Plateau Water, Backflow Assembly Testing FAQ
Why Grizzly
01
North or south plateau, we confirm which water district serves you before backflow work starts.
02
Repairs, installs, blowouts and backflow are the center of our business.
03
We see the yard, then give you the number in writing. No digging before you agree.
04
Drain lines, lighting wire and irrigation are planned together so the lawn is opened once.
05
From the first trench to cleanup, it's the Grizzly crew on site.
06
We cycle each zone in front of you and set the controller for the season.
Reviews
★★★★★
"… Danny did a fantastic job in designing our irrigation system for our new yard and his team planted our new trees and plants as well as installing our irrigation system. …"
Ronald H. · Google review
★★★★★
"… importing new soil, installing a new sod lawn … and finishing off with installing about 12 yards of bark. Danny and his crew did a great job. …"
Rolf W. · Google review
★★★★★
"Danny worked on our broken irrigation pipe and a underground connector. He was efficient, on time, and got the job done cleanly. …"
Anirban B. · Google review
Project photos

Before

After

Before

After
Before
After
How it works
01
Reach us at (425) 648-9443. Mention your water district if you know it; it's printed on the water bill.
02
We look at the system, the slope and the controller, then write up a price.
03
Our own people do the job and clean up after.
04
We test every zone together and fine-tune spray patterns before leaving.
Our warranty
Our warranty covers irrigation work and repairs, plus landscape lighting, for 18 months, and hardscaping for 12 months. When something we installed fails within that period, we return and repair it.
Other services
Paver patios, steps and retaining walls with a compacted, draining base for sloped plateau lots.
Fences and gates in cedar or treated wood, built to hold up through a wet plateau winter.
Low-voltage LED lighting for walkways, trees and patios, adjusted on site after sunset.
Clearing, grading, trenching and haul-off using our own mini excavator.
Questions
The city lists Northeast Sammamish Sewer and Water District for the north plateau and Sammamish Plateau Water for the south. It's printed on your water bill, and we check before any backflow work.
Northeast Sammamish Sewer and Water District wants test results reported each year by May 31. It mails a list of certified testers in early spring.
A new test. The district wants assemblies tested at installation, after any repair, after a move, and every year, and it needs a copy of each report.
In the northeast district, an approved double check valve assembly on the line feeding the sprinklers. Sammamish Plateau Water's FAQ doesn't name a type, so we confirm with the district.
Not too early. At Sea-Tac, the nearest NOAA normals station, the last spring frost comes around March 2 in a typical year and as late as March 23 in one year in ten. We start systems up after that.
In October. Sea-Tac's first frost comes around November 23 in a typical year and by November 6 in about one year in ten, and a blowout before then protects pipes, valves and the backflow assembly.
Yes, gently. The city treats slopes that drain straight to the lake as sensitive to erosion. Short cycles, heads aimed away from the bank and a working drain keep water and soil on your lot.
Yes. Grizzly Landscape & Construction LLC, L&I registration GRIZZLC755LL, is bonded and insured, and you can verify that on L&I's website.
Yes, all over Sammamish, including Sahalee, Inglewood, Sunny Hills, Pine Lake, Beaver Lake and Klahanie.
Ring (425) 648-9443 or leave your details in the form, and Danny will call back to arrange a visit to your yard.
Our service area
We work across Sammamish, north and south plateau, from Sahalee and Inglewood to Pine Lake, Beaver Lake and Klahanie.
Need service elsewhere in the county? See our irrigation services in King County.
Free estimate
Whichever district you're in, the estimate costs nothing. Send your details and Danny will phone you, or call (425) 648-9443 today.