Mukilteo, WA · On Possession Sound
Mukilteo sits on a plateau above Possession Sound, cut by gulches and served by two water districts. We fix, install and winterize sprinklers with both the slopes and the district rules in mind.
Irrigation leads our work. Need a drain, a patio, a new fence or yard lighting at the same Mukilteo address? One Grizzly crew can handle it.
A name and a phone number is enough. Danny will ring you to set up a visit.
Prefer to talk? Call (425) 648-9443
Most of Mukilteo sits on a plateau that drops off in tall bluffs toward the shoreline railroad, with Japanese Gulch, Big Gulch and other ravines cutting through. Mukilteo Water and Wastewater District serves north and central Mukilteo, and Alderwood Water & Wastewater District serves the south Harbour Pointe area. Paine Field, the NOAA station we use for frost timing, lies just southeast of the city. Its normals put the first fall frost near November 17, and by October 31 in about one year in ten.

What we fix and build

Spray heads tilted by roots, valves weeping into the lawn, lines broken during a fence or patio job. We isolate the problem, repair it and test the system again.

New irrigation for Mukilteo yards, with drip in planting beds and spray or rotors on lawn, laid out from the pressure you actually have.

On a plateau lot near a gulch, where the water ends up matters as much as coverage. We measure pressure, note the slope and keep spray off steep edges.

Air pushes the water out of each line, valve and backflow assembly. Paine Field's normals put the first frost in mid-November, so we book Mukilteo blowouts in October.

We install and repair the double check valve assembly Mukilteo Water and Wastewater District asks for on irrigation, and replace worn ones.

Water running off a plateau yard toward a slope, a lawn that puddles over dense ground, downspouts with no outlet. A French drain, catch basin or regrade sends it somewhere safe.
Slopes and soil
Mukilteo climbs from sea level to 597 feet. At two USGS study sites on city open space, the shoreline bluffs stand about 42 meters high. The city's 2024 plan lists steep slopes and landslide areas among its critical areas and warns that landslide risk climbs when steep slopes are soaked by heavy rain.
That 2016 USGS study found a cap of sandy, gravelly till over finer sand, silt and clay, all dense and generally slow to let water through. Water that can't soak down moves sideways along cracks and layers instead. For a sprinkler system on this kind of ground, that means short cycles, no spray aimed at a slope, and drain lines that carry extra water away from the edge.

Neighborhoods
The city's 2024 comprehensive plan describes several distinct neighborhoods. This is how irrigation work differs across them.
Old Town is the city's oldest neighborhood, at the north end between Port Gardner Bay and Mukilteo Boulevard, near the 1906 lighthouse on Point Elliott. The city plan notes that some homes in the northern half of Mukilteo still use septic systems, so we ask where the tank and drain field sit before any trench goes in.
Perched above Old Town, Goat Trail is known for twisting roads, big views and pockets of parks and open space. Views like that come with grades. Zones on a slope get short, repeated cycles, and we route runoff so it doesn't head downhill toward the house below.
Mid-Town is the geographic center of Mukilteo, first built up in the mid-1900s around the shopping hub at the Mukilteo Speedway and 84th Street SW, and it is still changing. A sprinkler system here may be decades old or brand new, so we check the age of the valves and pipe before quoting a repair.
Harbour Pointe was master planned, started in 1978 and annexed in 1991, which roughly doubled the city. It was built in sectors, with single-family homes, townhouses and apartments around a golf course. The south part of Harbour Pointe is on Alderwood Water & Wastewater District water, so we confirm your district first.
Chennault Beach is one of Mukilteo's main subdivision neighborhoods. The city keeps several ravines as public open space, Upper Chennault among them. Where a yard backs onto a ravine, heads point away from the edge and we skip long soaks above the slope.
Picnic Point is a single-family neighborhood ringed by the city's Municipal Urban Growth Area, and the Picnic Point ravine is city open space too. Homes in the growth area sit outside city limits, so we confirm which water district serves you before any backflow work.
Backflow and your district
An irrigation system is a cross-connection: a pressure drop could pull yard water back into the main. Mukilteo Water and Wastewater District runs a Cross Connection Control program under WAC 246-290-490 and its own Resolution No. 1548. In south Harbour Pointe, Alderwood Water & Wastewater District is the provider.
For an irrigation system without chemical addition, the district requires at least a Washington State approved Double Check Valve Assembly.
The district asks for a test every year by a Certified Backflow Assembly Tester, done before you first start irrigating.
If your system has none, the district asks you to have one installed by a plumber or irrigation specialist, tested, and then tested every year. Its website lists local testers and has an online Backflow Test Form.

Source: Mukilteo Water and Wastewater District, irrigation requirements
Why Grizzly
01
We confirm whether MWWD or Alderwood serves your address before any backflow work.
02
Most of what we do is sprinkler repair, new systems, fall blowouts and backflow assemblies.
03
You get a walk-through of the yard, then a written number, before any digging.
04
Sprinkler pipe, drain lines and lighting wire that share a route go in a single trench.
05
Your job stays with our crew, never a subcontractor.
06
On the last day we run each zone with you and set the controller together.
Reviews
★★★★★
"… He did a great job and was very thoughtful to not tear up the yard, and cleaned up the sidewalk as well. It turned out very nice! …"
Eric H. · Google review
★★★★★
"Grizzly recently provided landscaping for my property including installing a French drain, … installing a paver block sidewalk, installing a cobble landscape feature, installing trees, and grading the backyard and finishing off with installing about 12 yards of bark. …"
Rolf W. · Google review
★★★★★
"… I called Danny and he came right over that same day and found that there was a faulty valve and he took care of it right away. …"
Ronald H. · Google review
Our work

Before

After

Before

After
Before
After
How it works
01
Call (425) 648-9443 or use the form. Photos of the leak, dry patch or controller help us prepare.
02
We look at the system, the slope and the soil, then hand you a written price.
03
Grizzly's crew does every step, with no subcontractors.
04
Each zone runs in front of you, we adjust what needs it, and you keep our number.
Our warranty
In Mukilteo, as everywhere we work, irrigation jobs (repairs too) and landscape lighting come with an 18-month warranty. Hardscaping such as patios and walls gets 12 months. If our work fails in that time, we come back to put it right.
Other services
Patios, steps and retaining walls on a firm, free-draining base, built with Mukilteo's slopes in mind.
Wood fences and gates in cedar or pressure-treated lumber, with posts set for wet winter soil.
Low-voltage LED lighting along paths and steps and up into trees, so a sloped yard is easier to walk at night.
Site clearing, trenching, grading and haul-off, done with our own mini excavator.
Questions
Mukilteo Water and Wastewater District covers north and central Mukilteo. Alderwood Water & Wastewater District covers the south Harbour Pointe area. Your water bill shows which one you have, and we check before backflow work.
Mukilteo Water and Wastewater District asks for the irrigation assembly to be tested every year by a Certified Backflow Assembly Tester before you first start irrigating. In practice that means spring, before the first watering of the season.
The district asks you to have one installed by a plumber or irrigation specialist, have it tested, and then test it every year after that. For irrigation without chemical addition, the minimum is a Washington State approved Double Check Valve Assembly. We can install it.
The district's Testing Information page links a list of backflow testers and an online Backflow Test Form. You can also call the district office at 425-355-3355.
It can be, with care. The city's plan says landslide risk rises when steep slopes get soaked. We keep spray off the slope, use short cycles and send extra water away from the edge.
Yes. The city notes some homes in the northern half of Mukilteo still use septic. We ask where the tank and drain field are and plan pipe and trenches around them.
In October. Paine Field, just southeast of the city, has a median first frost of November 17 and a one-in-ten date of October 31 in NOAA's 1991–2020 normals.
It is. Grizzly Landscape & Construction LLC carries L&I contractor registration GRIZZLC755LL and is bonded and insured. L&I's Verify a Contractor tool shows the record.
South Harbour Pointe is on Alderwood Water & Wastewater District water, not MWWD. State rule WAC 246-290-490 applies on both systems, and we confirm your district's process before work starts.
Leave your name and number in the form or call (425) 648-9443. Danny will call back to pick a time, and the walkthrough and written estimate are free.
Areas served
We work in every part of Mukilteo: Old Town, Goat Trail, Mid-Town, Harbour Pointe, Chennault Beach and Picnic Point.
Need service elsewhere in the county? See our irrigation services in Snohomish County.
Free estimate
On MWWD or Alderwood water, the estimate is free. Leave a name and number for Danny, or call (425) 648-9443.